History, Restaged

The Theatre at the Ace Hotel (formally The United Artists Theatre) in Los Angeles was looking to update its rigging system in a very fast turn around.

Richard Parks, iWeiss VP, traveled to Los Angeles with our draftsman to do a survey and drafting on site. The old j bar guide system did not have standard spacing and there were other challenges including the installation of a new projection screen.  H & H Specialties, located in California worked with the iWeiss drawings to produce the equipment while the sewing shop back East produced all of the new soft goods for the theatre.

All in all, from contract to survey to manufacturing and installation of new counterweight equipment, projection screen and drapery, the project was completed in under 3 months.

The LA Register recently ran a great article about the recent changes in Los Angeles’ downtown Broadway Theater District

Check it out here:  LA Register Article

 

n7xv78-b88111570z.120140629092822000gt736uva.10